Home Kitchen

Cabinet renovation cost compared to new replacement cabinets

Cabinet resurfacing can be done in both residential and commercial settings. All cabinets can be coated (wood, laminate, thermofoil, even MDF). Worn and outdated cabinets can be easily transformed into cherry, maple, hickory, pecan and alder cabinets in a variety of door styles and finishes including paints, enamels and distressed finishes. Cabinet remodeling will transform any outdated kitchen into a custom modern kitchen at half the cost of new cabinets.

The renovation process involves replacing old doors and drawer fronts with full overlay doors and drawer fronts for an updated, modern look. Four-light and six-light doors are also available to accommodate glass inserts. In some cases, special glass, such as stained glass, can be reused in new doors. Cabinet boxes usually stay in place, which is eco-friendly and preserves existing countertops. Home and business owners often have expensive granite or solid surface countertops that they want to preserve. However, keeping existing countertops is often not an option when installing new replacement cabinets.

During the cabinet cladding process, a matching genuine wood veneer is applied to the exterior frames of the cabinet. Wood veneer is very expensive and has been used in the production of fine wooden furniture and musical instruments for hundreds of years and will last for many years. To ensure proper adhesion of the wood veneer, cabinet frames are thoroughly cleaned and abraded, and a commercial water-based adhesive is applied to both the wood veneer and cabinet frame surfaces. Ask your repair contractor to use an environmentally friendly, low-VOC, water-based adhesive to reduce the odor and fire hazards associated with solvent-based adhesives. As a final step in the veneer process, the inside three-quarter-inch cabinet frame edges are painted with a coordinated commercial paint to seal the edges of the wood veneer and provide a professional appearance; make sure your siding contractor includes this important step.

Since cabinet frames are the least attractive part of cabinets, when refreshing it’s important to use full overlapping doors and drawer fronts. The overlap affects the amount of cabinet frame that is exposed after the new doors and drawer fronts are installed. Full overlap means there is very little cabinet frame showing around each door and drawer front (one-fourth to three-eighths of an inch compared to two inches with standard overlapping doors and drawer fronts) creating a modern and uniform throughout the updated cabinets. In addition, exposed end panels, including the oversized refrigerator, island, and peninsula panels, are covered with matching quarter-inch flatwood panels or three-quarter-inch solid wood full-overlay decorative panels. inch for a custom, high-end look.

Most of the features available in new cabinets are also available in cabinet liner. Concealed soft-close hinges, replacement drawer boxes and pull-out trays with full-extension soft-close glides, swivel blind corners, and full-extension soft-close bin units are just a few of the many features. Available in cabinet trim. To further customize your capping project, solid wood trim, including top crown molding, light valances (bottom crown molding), corbels, table legs, and trim boards, can be added to the capping project. The following are many of the standard features included in cabinet renovation projects:

1) Full overlay, solid wood doors and drawer fronts (if possible avoid standard, less expensive vinyl and thermofoil doors and drawer fronts)

2) Concealed soft close door hinges

3) Matching genuine wood veneer for cabinet frames

4) Quarter-inch wood end panels and matching skid plates

5) Matching solid wood trim including decorative base moldings for exposed lower panels

6) New cabinet hardware (knobs, handles, and pulls)

7) Commercial silicone bumpers to protect new doors and drawer fronts

8) Removing old doors, drawer fronts and trim

As a bonus, some US cabinet makers also offer replacement doors, drawer fronts, and trim in addition to new cabinetry, allowing home and business owners to add new cabinetry to their renovation project. A new utility or pantry unit, a new pull-out waste unit, a new all-drawer unit, or even an all-new 42-inch upper wall cabinet can easily be added to the renovation project. New cabinets are usually installed during the five-day renovation process. Best of all, your friends will think you spent thousands more than you did!

Leave a Reply

Your email address will not be published. Required fields are marked *